Our Expertise - Your Solutions

As Your Full Service Professional Corrosion Control, Consulting And Marine Inspection Company – We Are There For You During All Stages Of The Project.

ACTUAL CASES HAS SHOWN

Cause for Paint Defects - Why?

According to studies and research in corrosion and having witnessed first hand, 85% of paint defects found on-board the ship are caused by POOR surface preparation leaving the 15% to ‘Other’ causes. Having this in mind, our priority would always start at surface preparation and ends until the last coating has been applied. Ensuring a concrete foundation for corrosion control.

Proper Surface Preparation Matters

Based on our experience, while using handtools may be low cost, however as shown in the graph, we could see that the surface preparation result is rather poor which leads to high probability of coating failure as the ship ages. On the other hand, surface preparation through different blasting methods are more efficient which lessens the probability of an early coating failure on the ship areas.

EXPLORE OUR SERVICES

DRY DOCKINGS

On all shipyards globally
Read more

PRE-DOCKING SURVEY

On board each ship
Read more

PAINT TECHNOLOGY

On each ship/office
Read more

TANK SURVEYS

On each vessel
Read more

NEW BUILDINGS

On all shipyards globally
Read more

CONSULTING

On each ship/office
Read more

IN-SERVICE REPAIR

On board your ship
Read more

NEW-BUILDING GUARANTEE PAINT SURVEY

On all shipyards globally
Read more

ACTUAL CASES HAS SHOWN

JMC Limited report that will serve as the guideline during initial owner/yard scope of work discussions.

Our clients will receive similar report scope during the project.